Primeira página
/
Literatura
/
While speaking with his general contractor, Alan sars "Wow! It's amazing house 'dried in already! I'm rea My looking forward to seeing twhen weekend." What does Alan mean? The foundation was just poured. The interior decoration is finished. The siding has been applied to the home. The house is complete.

Pergunta

While speaking with his general contractor, Alan sars "Wow! It's amazing
house 'dried in already! I'm rea My looking forward to seeing twhen
weekend." What does Alan mean?
The foundation was just poured.
The interior decoration is finished.
The siding has been applied to the home.
The house is complete.

While speaking with his general contractor, Alan sars "Wow! It's amazing house 'dried in already! I'm rea My looking forward to seeing twhen weekend." What does Alan mean? The foundation was just poured. The interior decoration is finished. The siding has been applied to the home. The house is complete.

Solução

expert verifiedVerification of experts
4.6224 Voting
avatar
IngridProfissional · Tutor por 6 anos

Responder

'The siding has been applied to the home.'

Explicação

## Step 1<br />The problem is a comprehension question based on a conversation between Alan and his general contractor. The conversation is about a house that Alan is building. The contractor tells Alan that the house is "dried in already". <br /><br />## Step 2<br />The term "dried in" in construction refers to the application of the exterior covering, which is typically some form of waterproof or water-resistant material. This is done to protect the interior of the house from the elements.<br /><br />## Step 3<br />Given this context, we need to interpret Alan's statement. He expresses amazement and looks forward to seeing the house over the weekend. This suggests that the application of the exterior covering is a significant step in the construction process.<br /><br />## Step 4<br />Now, we need to evaluate the options provided. The first option, "The foundation was just poured", is not correct because the foundation is an earlier stage in the construction process than the application of the exterior covering.<br /><br />## Step 5<br />The second option, "The interior decoration is finished", is also not correct because the interior decoration is a later stage in the construction process than the application of the exterior covering.<br /><br />## Step 6<br />The third option, "The siding has been applied to the home", is correct because it aligns with the context of the conversation. The term "dried in" refers to the application of the exterior covering, which is typically the siding.<br /><br />## Step 7<br />The fourth option, "The house is complete", is not correct because the house is not yet fully complete. The contractor has not yet finished all the stages of construction.
Clique para avaliar: